Search

Help

Page 5 of 11. Showing 101 results (0.016 seconds)

  1. Migrating to a New Server

    , such as repository clients on the server and build SDKs and command lines on any new agents. Startup the new Continua CI Server service and check that everything is working … of your new server. Possible issues Any external paths hard-coded in action or repository settings may not exist on the new server. If the new server
    Continua CIJun 23, 2020
  2. Team Foundation Server

    difficulty connecting, try specifying the [collection name] at the end of the server path. Note: If your TFS or VSTS repository is a Git repository,  use the Git repository type. TFS Version TFS 2010, 2012, 2013, 2015 and 2017 have been tested and work correctly with Continua CI. Older versions may also work
    Continua CIDec 18, 2018
  3. Once Off Trigger

    all repositories, or associate all changesets from all repositories that have been committed since the last successful build.
    Continua CIDec 09, 2018
  4. Weekly Trigger

    Associate only the latest changeset from all repositories, or associate all changesets from all repositories that have been committed since the last successful
    Continua CIDec 10, 2018
  5. Changeset Tag Object

    $ "Tag1" TaggerEmail The email address of the repository user who tagged the commit String $Source.RepoName.BuiltChangeset.Tags.First().TaggerEmail$ "john@company.com" TaggerName The username of the repository user who tagged the commit String $Source.RepoName.BuiltChangeset.Tags.First().TaggerName
    Continua CIDec 09, 2018
  6. Mercurial over SSH

    Getting Continua to work with a mercurial repository over SSH takes a couple of additional steps. Step 1.) Install Putty Download the set of putty tools … repo.   Step 3.) Storing public key on the SSH Server If your repository resides on a hosting website like codebashq or bitbucket, you'll need to follow
    Continua CIDec 03, 2018
  7. Builds

    : These triggers will fire a build on a specific day or at a specific time. Repository Triggers: These triggers are linked to your Version Control Systems (VCS … be associated with this build for all repositories on this build.  There are two options for Associate: Most recent changesets: This will only link the latest changeset
    Continua CIDec 02, 2018
  8. What are Build Event Handlers?

    Build Event Handlers are tasks which execute on the server (as opposed to Actions which run on the agents). They can be configured to respond to one or more Build Events which occur as the build progresses. They are generally used to trigger changes to repositories or variables which reside on or are accessed via
    Continua CIMar 14, 2016
  9. Part 3: Build your Web App with Continua

    Configuration via our VCS. Navigate to the Repositories page under the Configuration Wizard for our Deploy Configuration. On this page you can link your VCS to Continua CI at either the Global, Project or Configuration level (learn more about Repository Scope). For this tutorial, lets link our repository
    Continua CIDec 16, 2018
  10. Distributed Architecture

    repositories, variables, files and actions. The agent then steps through and executes each action in the stage. The agent sends all the designated information … . This folder can be accessed with Expressions by using the following syntax: $Workspace$\Output. Repository files: These are files that are pulled from your source
    Continua CIJul 18, 2019